2018 BMW M2 Base at Ed Martin Nissan Indianapolis
https://research.edmartinnissan.com/cars/Used/2018/BMW/M2/Base/167192392018 BMW M2 Base
Selling Price : $38,900
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 42,088
- VIN : WBS1J5C56JVA12885
- Stock # : 1FR0715A
- Engine : Intercooled Turbo Premium Unleaded I-6 3.0 L/182
- Transmission : 6-Speed Manual w/OD
- Ext. Color : Alpine White
- Int. Color : Black w/Blue Stitching
- Vehicle Type : 2dr Car
- Body Style : 2dr Car
- Drivetrain : RWD
City MPG *
18
Hwy MPG *
26
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Alpine White 2018 BMW M2ONE OWNER L0CAL TRADE!, GREAT VEHICLE HISTORY!, FULLY SERVICED AND READY TO GO!, BLUETOOTH!, USB PORT!, REARVIEW CAMERA!, HEATED SEATS!, CLEAN CARFAX!, EXECUTIVE PACKAGE!!, APPLE CARPLAY!!. Odometer is 24810 miles below market average! 18/26 City/Highway MPG Priced below KBB Fair Purchase Price! Well Equipped with: Executive Package (Active Driving Assistant, Adaptive LED Headlights, Automatic High Beams, Heated Steering Wheel, Rear Park Distance Control, Speed Limit Info, WiFi Hotspot, and Wireless Charging), 12 Speakers, 4-Wheel Disc Brakes, ABS brakes, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM, AM/FM Stereo, Apple CarPlay, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, Brake assist, Bumpers: body-color, CD player, Dakota Leather Upholstery, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, DVD-Audio, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Enhanced USB & Bluetooth, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front reading lights, Front Sport Seats, Fully automatic headlights, Garage door transmitter, harman/kardon Logic 7 Digital Surround, harman/kardon Speakers, Heated door mirrors, Heated Front Seats, Heated front seats, Illuminated entry, Knee airbag, Leather Shift Knob, Low tire pressure warning, Lumbar Support, Memory seat, Navigation System, Occupant sensing airbag, Outside temperature display, Overhead airbag, Panic alarm, Passenger door bin, Passenger vanity mirror, Power door mirrors, Power driver seat, Power Front Seats, Power passenger seat, Power steering, Power windows, Radio data system, Rain sensing wipers, Rear anti-roll bar, Rear seat center armrest, Rear window defroster, Remote keyless entry, Security system, SiriusXM Satellite Radio, Speed control, Speed-sensing steering, Speed-Sensitive Wipers, Split folding rear seat, Spoiler, Sport steering wheel, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Variably intermittent wipers, and Wheels: 19 x 9.0 Fr & 19 x 10.0 Rr Black.All of our vehicles are fully serviced and detailed to give you that New Car Experience without the New Car Price Call for details on this vehicle or any other quality pre-owned vehicle in our inventory.
Vehicle Features
- Wheels: 19 x 9.0 Fr & 19 x 10.0 Rr Black
- Front Sport Seats
- Dakota Leather Upholstery
- AM/FM Stereo
- Apple CarPlay
- Heated Steering Wheel
- Power Front Seats
- Lumbar Support
- Heated Front Seats
- Rear Park Distance Control
- Adaptive LED Headlights
- Automatic High Beams
- Active Driving Assistant
- SiriusXM Satellite Radio
- harman/kardon® Logic 7® Digital Surround
- Enhanced USB & Bluetooth
- Wireless Charging
- WiFi Hotspot
- Speed Limit Info
- 12 Speakers
- Emergency communication system: BMW Assist eCall
- harman/kardon® Speakers
- Exterior Parking Camera Rear
- AM/FM radio: SiriusXM
- Speed-Sensitive Wipers
- Auto-dimming Rear-View mirror
- Front beverage holders
- Variably intermittent wipers
- Turn signal indicator mirrors
- Trip computer
- Traction control
- Tilt steering wheel
- Telescoping steering wheel
- Steering wheel mounted audio controls
- Sport steering wheel
- Split folding rear seat
- Speed-sensing steering
- Speed control
- Security system
- Remote keyless entry
- Rear window defroster
- Rear seat center armrest
- Rear anti-roll bar
- Rain sensing wipers
- Radio data system
- Power windows
- Power steering
- Power passenger seat
- Power driver seat
- Power door mirrors
- Passenger vanity mirror
- Passenger door bin
- Panic alarm
- Overhead airbag
- Outside temperature display
- Occupant sensing airbag
- Memory seat
- Low tire pressure warning
- Knee airbag
- Illuminated entry
- Heated front seats
- Heated door mirrors
- Garage door transmitter
- Fully automatic headlights
- Front reading lights
- Front dual zone A/C
- Front anti-roll bar
- Four wheel independent suspension
- Dual front side impact airbags
- Dual front impact airbags
- Driver vanity mirror
- Driver door bin
- Delay-off headlights
- DVD-Audio
- CD player
- Bumpers: body-color
- Brake assist
- Automatic temperature control
- Auto-dimming door mirrors
- Alloy wheels
- ABS brakes
- Tachometer
- Spoiler
- Navigation System
- Leather Shift Knob
- Front Center Armrest
- Front Bucket Seats
- Electronic Stability Control
- Air Conditioning
- 4-Wheel Disc Brakes
- Turbocharged
- Rear Wheel Drive
- Power Steering
- ABS
- 4-Wheel Disc Brakes
- Brake Assist
- Locking/Limited Slip Differential
- Aluminum Wheels
- Tires - Front Performance
- Tires - Rear Performance
- Heated Mirrors
- Power Mirror(s)
- Integrated Turn Signal Mirrors
- Power Folding Mirrors
- Rear Defrost
- Intermittent Wipers
- Variable Speed Intermittent Wipers
- Rain Sensing Wipers
- Rear Spoiler
- Power Door Locks
- Daytime Running Lights
- Automatic Headlights
- Headlights-Auto-Leveling
- LED Headlights
- AM/FM Stereo
- HD Radio
- CD Player
- MP3 Capability
- Steering Wheel Audio Controls
- Auxiliary Audio Input
- Hard Disk Drive Media Storage
- Satellite Radio
- Requires Subscription
- Premium Sound System
- Bucket Seats
- Power Driver Seat
- Power Passenger Seat
- Heated Front Seat(s)
- Pass-Through Rear Seat
- Rear Bench Seat
- Adjustable Steering Wheel
- Trip Computer
- Telematics
- Requires Subscription
- Driver Adjustable Lumbar
- Passenger Adjustable Lumbar
- Leather Steering Wheel
- Keyless Entry
- Power Door Locks
- Keyless Start
- Keyless Entry
- Power Door Locks
- Hands-Free Liftgate
- Universal Garage Door Opener
- Cruise Control
- Climate Control
- Multi-Zone A/C
- A/C
- Leather Seats
- Auto-Dimming Rearview Mirror
- Driver Vanity Mirror
- Passenger Vanity Mirror
- Driver Illuminated Vanity Mirror
- Passenger Illuminated Visor Mirror
- Floor Mats
- Navigation System
- MP3 Capability
- Bluetooth Connection
- Mirror Memory
- Seat Memory
- Keyless Start
- Smart Device Integration
- Power Windows
- Power Door Locks
- Trip Computer
- Security System
- Immobilizer
- Traction Control
- Stability Control
- Traction Control
- Front Side Air Bag
- Telematics
- Requires Subscription
- Tire Pressure Monitor
- Driver Air Bag
- Passenger Air Bag
- Front Head Air Bag
- Rear Head Air Bag
- Passenger Air Bag Sensor
- Knee Air Bag
- Back-Up Camera
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.
